|
Building the interior partitions while waiting for frosty mornings to stop (not going up on that roof yet!). None of them are load-bearing since the SIP structure (and two interior columns) handle it all. Once the walls are done, the second-story loft is next. |
Beginning | 1/3 Done | 2/3 Done | Loft Floor |
Loft Side | Other Side | Loft End | View South |
View North |