Previous M A C K Y ' S   N E W   H O U S E Next
Interior Framing

Building the interior partitions while waiting for frosty mornings to stop (not going up on that roof yet!). None of them are load-bearing since the SIP structure (and two interior columns) handle it all. Once the walls are done, the second-story loft is next.
Beginning 1/3 Done 2/3 Done Loft Floor
Beginning 1/3 Done 2/3 Done Loft Floor
Loft Side Other Side Loft End View South
Loft Side Other Side Loft End View South
View North
View North