Previous M A C K Y ' S   N E W   H O U S E Next
Finishing Roof Panels

Roof panel sides are already finished with 2× sub-fascia, but since R-Control panels max out at 24' long, and I needed 25' and change to get a 2' overhang, more work at the tails was needed. The I-Joists extend full length (cut plumb), but have to be boxed in top and bottom with more OSB, and more 2× stock added for the sub-fascia.
Boxing Eaves Sub-Fascia Other Side Boxed
Boxing Eaves Sub-Fascia Other Side Boxed